← Back to the Journal

Project story · Grand Junction, Colorado

CMU Library: From Shop Floor to a Three-Story Renovation

How Azar's Woodcraft coordinated custom millwork manufacturing and installation nearly four and a half hours from its facility.

Completed CMU Library circulation desk and reading area
Three-story renovationApproximately one year4½ hours from our shopFabricated and installed by Azar's

More Than a Library Furniture Project

CMU Library in Grand Junction, Colorado, underwent a complete three-story renovation that included major structural repairs. The library was closed throughout construction. Azar’s Woodcraft manufactured and installed an extensive millwork package: circulation desks, shelving, built-ins, casework, architectural wall panels, end panels, trim, and window and door frames.

Library interior during renovation
Library interior during renovation

The Challenge of Working Four and a Half Hours Away

Our manufacturing facility in Erie was approximately 4½ hours from the jobsite. As construction progressed and areas became ready for our work, our team returned to the library for field measurements. We updated shop drawings to reflect actual building conditions rather than relying on original architectural plans alone.

Wood panel installation in progress
Wood panel installation in progress

Built and Checked in Our Shop

Back in Erie, we fabricated and fully assembled the millwork to verify fit, alignment and transitions before shipping. The circulation desk is a good example: its long sections and angled joints were brought together in our shop, then disassembled for transport to Grand Junction.

Custom CMU circulation desk assembled in the Azar’s Woodcraft shop
Custom CMU circulation desk assembled in the Azar’s Woodcraft shop
Circulation desk shop assembly, first angle
Circulation desk shop assembly, first angle
Circulation desk shop assembly, detailed angled transition
Circulation desk shop assembly, detailed angled transition

The Same Craftsmen Built It and Installed It

The shop staff who manufactured the millwork also traveled to CMU to install it. They knew how the assemblies were constructed and could make necessary onsite adjustments with firsthand knowledge of the details. That continuity mattered on a complex renovation far from our shop.

Custom glass-fronted display cases
Custom glass-fronted display cases

A Coordinated Weekly Process

Over approximately a year—perhaps a little less—our team repeated a carefully planned sequence: field measure, update drawings, fabricate, assemble in the shop, disassemble, load trucks, deliver weekly and install. While the onsite crew worked on one area, the shop prepared the next.

Completed library service counter
Completed library service counter

The Finished Library

The completed work ranged from circulation and service counters to integrated shelving, display cases, cabinetry and architectural wall treatments. Together, the project illustrates how careful field coordination, custom manufacturing and hands-on installation help bring a complex institutional interior together.

Finished library millwork
Finished library millwork

During the Renovation

A short video from the project site during the renovation.

From Manufacturing to the Finished Space

For this project, our responsibility extended well beyond producing individual components. Our team coordinated field conditions, shop drawings, fabrication, transportation and installation as the larger renovation progressed. The same people who built the millwork were there to fit it into the finished building.